What are the responsibilities and job description for the Construction Scheduler position at Hays?
Scheduler - Commercial Construction
Commercial construction scheduler using Primavera
Primary Responsibilities :
- Ability to build and manage a Baseline schedule using CPM best practices including the WBS to detail out the areas / types of work
- Run weekly meetings to update the construction schedule via job walks and / or superintendent live updates
- Ability to create, maintain, and edit different layouts in P6 to (but not limited to) :
- Update the schedule efficiently
- Create easy to read and understand reports
- Analyze the critical path to specific activities
- Quickly and efficiently identify variance from previous baselines
- Filter work by various trades, time frames or areas to create custom reports for the team to utilize in their day-to-day activities
- Maintain and update a resource loaded schedule to keep cost and durations accurate
- Create TIA reports using historical data captured from the CPM tool being utilized on site
- Use Excel to analyze large data sets and multiple schedules at once
- Interface with clients in a 1 on 1 basis and address their concerns / requests
Requirements for this position include :