What are the responsibilities and job description for the Sr Construction Scheduler position at LanceSoft?
Job Title : Sr Construction Scheduler
Job Duration : Temp-to-Hire after 520 hrs. worked minimum for the right fit
Est. Pay Range : $48.00 - $53.00 / Hourly on W2 (Based on Experience)
Work Type : Boise ID 83716 ( Onsite)
Responsibilities :
- Provides guidance, direction, and specialized assistance for the resolution of difficult project control problems.
- Analyzes, evaluates, and forecasts current status against an established baseline schedule.
- Intimate familiarity with P6 and ability to administer OPC (next generation P6) content from third-party partners, manage Program Schedule Content, and establish guidelines for schedule control, including the development of the Basis of Schedule (BOS). Assesses the impact(s) of design or construction changes and schedule slippages.
- Reports status of schedule to appropriate project and Company management as well to the client.
- Understands and applies engineering, procurement, and construction terminology, concepts, and relationships.
- Develops and maintains critical path logic networks and bar charts utilizing this information.
- Customizes project control systems to meet specific project requirements.
- Accumulates historical data, such as performance experience, for use in maintaining a realistic basis for future planning and forecasting.
- May supervise and provide performance reviews for one or more lower level Project Control Specialists and / or support personnel.
- Provides input to Sr. Project Control Staff regarding staffing requirements.
- Performs other responsibilities associated with this position as may be appropriate.
- Expertise in Progress Measurement using EVM, including quantity-based EVM within partner work environments and financially based EVM for the overall program.
- Leadership in planning / scheduling efforts, collaborating with partners to develop system-based schedules early in the project lifecycle.
- Support for internal Client reporting calendar and reporting requirements.
Qualifications :
Salary : $48 - $53