Demo

Overhead Conveyance Installer - Data Center Construction

NTI Connect LLC
Mesa, AZ Full Time
POSTED ON 2/7/2025
AVAILABLE BEFORE 3/7/2025
 
 

Full Time

Overhead Conveyance Installer - Data Center Construction
Location: Various Sites (Travel Required)

National Technologies (A Network Connex Company) is a premier turn-key provider of fiber optic and data center installation services. Whether it’s learning the latest techniques in the field or working with vendors to maximize material performance, NTI is consistently at the forefront of innovation in the Telecommunications industry.

If being a part of a tight-knit organization that operates in some of the most innovative environments around the world sounds like your dream job, then you should experience the culture at NTI! While providing the typical perks of a large company, NTI remains true to its roots. At the core of our company is a family-oriented business that treats our team as integral members of the organization and not just a number. The open-door, collaborative nature of NTI fosters professional growth and nurtures ideas that propel the company forward into the future of the industry.


Job Summary & Responsibilities:

  • Perform data center cage, cabinets, and overhead conveyance installations, including ladder rack, fiber guide, and basket tray, in accordance with industry standards
  • Unistrut, containment, and overhead conveyance installations
  • Measure and cut accurately, install level and plumb
  • Pull, dress, ribbon splice, and test fiber from 24 SMF to 3456 SMF
  • Read and follow drawings, instructions, and specifications while maintaining the project scope and adhering to safety procedures
  • Prepare field notes, interpret engineering drawings in the field, and make recommendations for changes as required
  • Coordinate and communicate activities with other employees, departments, and management

Knowledge, Skills, or Abilities:

  • Knowledge of basic tools, construction practices, and communication networks
  • Understanding of cable installation practices, including dressing and lacing cables
  • Familiarity with various manufacturers’ ISP racks, cabinets, ladder racks, fiber guides, and termination panels
  • Knowledge of fiber optic cable types and manufacturer specifications to prevent cable damage
  • Proficiency in cable testing procedures and test equipment
  • Awareness of inside plant safety measures

Qualifications & Skills:

  • Strong computer skills with Microsoft applications
  • Good work ethic and willingness to learn
  • Ability to multitask and stay organized under pressure
  • Must hold a valid driver’s license and satisfactory driving record

Education and Experience:

  • Education Level: High School/GED
  • Experience: 4-6 years of relevant job experience (similar industry or essential duties)
  • Field of Study: Electronics, Telecommunications, Construction, or Project Management

Physical Requirements:

  • Ability to sit, climb, balance, stoop, kneel, crouch, and crawl; lift up to 75 lbs.; work in all weather conditions

EEOC-Minority/Female/Disability/Veteran
Network Connex believes in equal employment opportunities for all. We do not discriminate against employees or applicants based on race, color, gender, sexual orientation, domestic partnership status, ancestry, religion, national origin, citizenship status, marital status, disability, veteran status, age, or any other protected status. Upon acceptance of an offer, all candidates are required to pass a background check and drug screening.

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Overhead Conveyance Installer - Data Center Construction?

Sign up to receive alerts about other jobs on the Overhead Conveyance Installer - Data Center Construction career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$54,843 - $70,926
Income Estimation: 
$64,363 - $82,295
Income Estimation: 
$64,363 - $82,295
Income Estimation: 
$77,833 - $100,819
Income Estimation: 
$78,261 - $98,346
Income Estimation: 
$103,361 - $128,703
Income Estimation: 
$103,361 - $128,703
Income Estimation: 
$120,489 - $151,280
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at NTI Connect LLC

NTI Connect LLC
Hired Organization Address Norcross, GA Full Time
Full Time Atlanta Network Connex has been serving the telecom industry for more than 20 years, Network Connex accelerate...
NTI Connect LLC
Hired Organization Address Norcross, GA Full Time
Full Time Atlanta, GA Network Connex has been serving the telecom industry for more than 20 years, Network Connex accele...
NTI Connect LLC
Hired Organization Address Dallas, TX Full Time
Network Connex leverages regional strengths and operational synergies to provide best-in-class, self-performed communica...
NTI Connect LLC
Hired Organization Address Dallas, TX Full Time
Full Time Dallas Network Connex has been serving the telecom industry for more than 20 years, Network Connex accelerates...

Not the job you're looking for? Here are some other Overhead Conveyance Installer - Data Center Construction jobs in the Mesa, AZ area that may be a better fit.

AI Assistant is available now!

Feel free to start your new journey!