- Check With Supervisor For Priority Work First Thing
|
- Remediate Any Open Safety Hazard And Notify Supervisor
|
- Check Dryer Pit. Any Build Up Under 1St And 2Nd Sections Must Be Shoveled Up
|
- Locker Room And Bathrooms Once Per 24Hrs (Mop Floors Using Clean Water ) Wipe Down All Tables And Benches And Empty Trash
|
- Front Office Once Per 24Hrs Vacuum And Wipe Down All Table Tops And Empty Trash
|
- Beater Room Basement, Shovel Up All Heavies And Wash Down Any Stock Or Foam As Needed
|
|
- Degrease Floor Front And Backside Of Dryers Twice A Week
|
- Clean Out Any Stock And Loose Paper From Pit And Wash Down
|
- Clean Floors By The Liner And Filler Machine Chest Once Per Day
|
- Check Freeman Press Area And Chute Several Time Per Shift (Clean As Needed)
|
- Outside Court Yard Clean Up Any Loose Paper Or Broken Pallets, Bad Pallets Are To Be Stacked Ten High And Banded
|
- Core Room (Sweep And Organize Twice Per Week Or As Needed)
|
- Dump All Core Baskets And Garbage On The Dry End Once Per 24Hrs
|
- Sweep And Mop Lab Twice Per Week
|
- Sweep Floors In All MCC Rooms Once A Week And Report And Light Bulbs That Are Burnt Out
|
- Clean Screen Isle Once Per 24 Hours Or As Needed
|
- Shovel Stock Up Over At The Clarifier And Check Dumpster (Dump As Needed)
|
- Clean Back Dock Rake Up All Loose Paper Make Sure No Paper Is Sticking To Air Makeup Or Basement Fan Intakes
|
- Wash Up And/Or Shovel Out Small Basement
|
- Change All Garbage Cans And Sweep And Mop Supervisors Offices Twice A Week Or As Needed
|
- Check Freeman Press Dumpster And Clarifier Dumpster Three Times A Shift
|
- Wash Mats In Lab, MCC Rooms, Chemical Area, Freeman , Maintenance, Beater Room
|