Demo

Construction Scheduler

PIC Group, Inc.
Keenesburg, CO Full Time
POSTED ON 4/15/2025
AVAILABLE BEFORE 5/14/2025
At PIC Group, Inc., our emphasis is on excellence. We recruit the strongest candidates in the power generation industry. As a global service provider, we continually seek talented individuals.

Title: Construction Scheduler/Planner

Position Type: Contract

Location: Colorado

Reports to: Project Manager

Status: Non-Exempt

Job Summary

PIC Group has an outstanding opportunity for an experienced Construction Scheduler/Planner to support the construction of a 162MW gas fired peaking plant. The Construction Scheduler reports directly to the Commissioning Manager and will be responsible for monitoring and documenting all construction progress, as well as identifying, tracking and assisting in resolution of construction issues/conflicts. The Construction Scheduler/Planner will manage and oversee all aspects of the schedule status to ensure compliance with construction contract specifications and other documents, regularly communicating any updates to the Commissioning Manager or external clients as required.

Essential Duties And Responsibilities

  • Effectively interface and participate in difficult conversations with entire project team members that include the asset Owner, General Contractor, and all Subcontractors and Suppliers.
  • Build relationships with everyone on the project, both internal and external to the project.
  • Collect, input, validate and analyze progress in the master schedule using P6.
  • Assess that project objectives, both short and long term, are being met.
  • Manage details discussed by numerous project stakeholders and when needed, include any schedule modifications.
  • Produce standard schedule reports based on plant requirements.
  • Sequence major work priorities into a logical schedule.
  • Provide metrics of completion of scheduled and unscheduled work.
  • Work with functional management to resolve scheduling issues or risks.
  • Review contracts, documents, and drawings to determine work scope and schedule development.
  • Ensure project Work Breakdown Schedule (WBS) complies with functional requirements.
  • Oversees and verifies the accuracy of critical paths across projects.
  • Oversee the review and validation of overall project durations on multiple projects.
  • Assist with managing warranty claims through EPC contractor and equipment suppliers.
  • Assist with receiving materials or any other duties as assigned.
  • Produce ad hoc reports upon request.
  • Monitor schedule for changes in float, correct logic, potential problems, proper required coding, and budgeted resources.
  • Monitor upstream activities that feed engineering, procurement and construction activities for any potential impacts and report these items to site management.
  • Continually update schedule of work based on priorities and break-in work.

Job Requirements

  • Prior work experience in the construction industry, with a strong comprehension of how to properly manage a project schedule.
  • Proficiency with Oracle Primavera 6 and Microsoft Project, well as MS Office, Adobe, Bluebeam, Synchro, Vico, and NetPoint.
  • Proven capability with how to properly develop and build an effective project plan.
  • Proficient in managing and understanding cost, manpower and equipment resource loaded schedules.
  • Demonstrated skills in gathering, maintaining, reporting and analyzing schedule data.
  • Must understand and adhere to all safety protocol for active construction sites.
  • Proficient with understanding project risk management as well as the impact that change management can have on schedules.
  • Capable of following all Quality Control & ISO / Lean protocol for construction projects.
  • Extreme proficiency with effectively communicating with all levels of personnel involved with the project.
  • Capable of learning about recent or new innovation & technology to improve project duration and completion.

Physical Requirements

  • Duties require walking, standing, and sitting for extended periods of time, climbing vertical and inclined ladders and stairs, and lifting and when needed carrying up to 50 lbs.
  • Specific vision abilities required by this job include close vision, distance vision, peripheral vision, depth perception, and the ability to adjust focus.
  • Must be able to use protective equipment correctly (i.e., hard hats, safety glasses, ear protection, safety shoes, gloves, vests, etc.).

Education / Experience

  • HS Diploma required.
  • 10 years of Scheduling/Planning experience in heavy industrial construction or manufacturing (including power plants).
  • Prior hands on experience with P6 required.

Compensation

The hourly rate for this position generally ranges between $55 - $65.

**Please note that the compensation information follows a good faith estimate for this position only and is provided pursuant to the Colorado Equal Pay for Equal Work Act and Equal Pay Transparency Rules. The actual hourly rate will vary and may be above or below the range based on various factors as permitted by Colorado Equal Pay Transparency Rule 4.1.2. It assumes that the successful candidate will be in Colorado or perform the position from Colorado. **

We take pride in offering a wide range of exceptional benefits to our valued team members. When you join our team, you'll gain access to top-notch medical, vision, and dental insurance plans, ensuring you and your loved ones receive the healthcare you deserve. Your future matters to us, which is why we provide a robust 401(k) plan, helping you secure financial stability for the years ahead. Embrace a fulfilling career with a company that prioritizes your health, happiness, and growth.

Salary : $55 - $65

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

What is the career path for a Construction Scheduler?

Sign up to receive alerts about other jobs on the Construction Scheduler career path by checking the boxes next to the positions that interest you.
Income Estimation: 
$65,079 - $82,270
Income Estimation: 
$88,573 - $114,377
Income Estimation: 
$102,413 - $133,130
Income Estimation: 
$91,640 - $116,747
Income Estimation: 
$119,541 - $162,386
Income Estimation: 
$79,271 - $104,411
Income Estimation: 
$94,266 - $116,554
Income Estimation: 
$94,266 - $116,554
Income Estimation: 
$116,182 - $159,475
Income Estimation: 
$109,098 - $146,006
Income Estimation: 
$127,155 - $203,371
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Job openings at PIC Group, Inc.

PIC Group, Inc.
Hired Organization Address Keenesburg, CO Full Time
At PIC Group, Inc., our emphasis is on excellence. We recruit the strongest candidates in the power generation industry....
PIC Group, Inc.
Hired Organization Address Franklin, LA Full Time
At PIC Group, Inc., our emphasis is on excellence. We recruit the strongest candidates in the power generation industry....
PIC Group, Inc.
Hired Organization Address Keenesburg, CO Full Time
At PIC Group, Inc., our emphasis is on excellence. We recruit the strongest candidates in the power generation industry....
PIC Group, Inc.
Hired Organization Address Marshall, MI Full Time
At PIC Group, Inc., our emphasis is on excellence. We recruit the strongest candidates in the power generation industry....

Not the job you're looking for? Here are some other Construction Scheduler jobs in the Keenesburg, CO area that may be a better fit.

Scheduler

PCL Construction, Denver, CO

Construction Scheduler II

RES, Denver, CO

AI Assistant is available now!

Feel free to start your new journey!