What are the responsibilities and job description for the Quality Inspector (Electric Heaters) @ Hanibal, MO 1099 Contractor) position at Pro QC International?
- THIS IS NOT A FULL-TIME JOB || THIS IS A 1099 CONTRACTUAL OPPORTUNITY IN THE Hanibal, MO AREA**
- Conduct PIM Inspection of Electric Heater under QM 31 (Heat Transfer Equipment).
- Inspect the following Electric Heater Items
- Verify compliance with Aramco standards and specifications.
- Document inspection findings and provide a detailed report.
- MANDATORY Aramco-Approved Inspector Certification.
- QM 31 Code Qualification for inspecting heat transfer equipment (electric heaters, heat exchangers, pressure vessels).
- Expertise in heat transfer principles, including resistance heating elements, control systems, and insulation integrity.
- Proficiency in industry standards: ASME BPVC, API 530 & 660, NACE, IEC/IEEE Electrical Standards.
- Experience in Performance Integrity Management (PIM) Inspections, ensuring compliance with material specs, welding, and safety standards.
- Skilled in technical drawings (P&IDs, isometrics, WPS/PQR) and NDT methods (PT, UT, RT, VT) for structural integrity assessments.
- Minimum 5 years of experience in inspection of heat transfer equipment (Electric Heaters)
- Aramco-Approved Inspector Certification (Active)
- MANDATORY QM 31 Code Qualification for heat transfer equipment inspection
- NDT Certifications (preferred but not mandatory): ASNT Level II/III in PT, UT, RT, and/or VT
- PREFERRED API 510/570/571/580 Certifications
- PREFERRED ASME/AWS Welding Inspection Certification
- Extensive oil & gas, petrochemical, and energy sector experience in inspection and QA/QC of heat transfer equipment.
- Prior Saudi Aramco project experience with a strong understanding of ARAMCO standards and specifications.
- Hands-on expertise in electric heaters, fired heaters, heat exchangers, pressure vessels, and piping systems.
- Experience in EPC projects for refineries, gas plants, and power generation facilities.
- Proficient in Factory Acceptance Tests (FATs), Pre-Shipment Inspections (PSIs), and vendor audits.
- Strong QA/QC background in manufacturing, ensuring compliance with industry standards.
- Skilled in Root Cause Analysis (RCA) and Failure Mode & Effect Analysis (FMEA) for heat transfer equipment.
Shift Hours: Standard working hours per factory and inspection requirements || Each 1099 Project is different for different client
Current Project Duration: Est: 2 Days (April 9 - April 10, 2025); || Each project will have different schedule and end date varying client to client
Job type: 1099 contract
Ability to commute to Hannibal, MO 63401, USA